Successful case
-
6 set Oil Immersed Transformer For Kenya
TSTY 6 set S11 oil immersed transformer are ready to ship to the customer site in the Kenya.
-
2 set switchgears are ship toPhilippines
TSTY 2 set KYN28A Switchgears are ready to ship to the customer site in the Philippines.
-
2000kva oil-immersed transformer used in Kenya
TSTY 2000kva oil immersed transformer used for factory in kenya
-
10000kva oil immersed transformer for Singpore
S11 series 10000kva 35kv oil immersed transformer was ready to send to singapore .
-
2set 500kva 33kv oil transformer used for community in Nigeria
2 set S11 series 500kva 33kv oil transformer used for community in NigeriaThe company manufactures production of S11 - M series the whole sealing oil-immersed power transformer
-
3 set 2000kva oil transformer for Zimbabwe textile mill
TSTY 2000kva oil immersed transformer is used for textile mill in Zimbabwe
-
TSTY Switchgears for Government Project
TSTY switchgears are used in government projects, and our team of engineers is guiding the installation on site
-
2500kva transformer in Philippines paper factory site
TSTY 2500kva oil type transformer is used for paper factory in Philippines
-
300kva oil immersed power transformer for Nigeria
TSTY 3 set 300kva oil immersed transformer is used for mill factory in Nigeria, the transformer model is S11-M.ZT, These transformers are designed and developed using latest technologies and can be provided with a variety of terminations so as to suit the requirements for new installation or replace...
-
4500kva transformer at the customer site
We design transformers for customers according to their needs, provide customers with high-quality transformers, and save a lot of costs, customers are very grateful to cooperate with us!
-
2 set 4500kva oil transformer exported to Indonesia
2 set 4500kva oil transformer exported to Indonesia
-
10 kV Substation Delivery to Sanxia University
TSTY Electric’s 10 kV substations will be delivered and installed in Sanxia University. The new substations will meet the huge electricity demand of the campus.